|
Priority Emergency Service - Nobody can get you back
on-line faster. |
|
- 24 hours service
- you make only one call
- Fully stocked trucks
- we have the parts you need or will get them quickly to minimize downtime
- Knowledge of your
electrical system - our experience with your system reduces your cost
|
|
Energized Preventive Maintenance - Diagnostic testing and
most of the critical preventive maintenance is performed with the system
energized. |
|
- Infrared, harmonics,
true RMS, power factor tests - catastrophic failures, hazards and
fire risks can be reduced
- Visual Inspection
- hazardous conditions can be detected by the professional
- Hot spots -
eliminating hot spots reduces your energy cost
|
|
De-Energized Preventive Maintenance - It is very important
to schedule downtime and perform essential tasks on all electrical equipment
and components. We have the resources to perform the work swiftly and
correctly. |
|
- Inspect and retorque
connections - eliminates high resistance connections that waste
energy and pose a fire hazard
- Clean and vacuum
components - eliminates risk of electrical explosion
- Resistance test (Megger)
bus bars, cable and motor windings - prevents outages due to faults
|
|
Switchgear Maintenance - Electrical Construction and
Maintenance Magazine published the following quote in their January,
1995 issue.
"Switchgear installed by
contractors in the late 60s and 70s to meet the increasing load demands of
industry began to fail in the 80s and 90s. These failures have been
documented and are available in the IEEE and Doble
Engineering Minute reports. This failure trend will continue in spite
of state-of-the-art changes in construction techniques and installation
methods unless preventive maintenance steps are taken."
|
|
Infrared Testing and Reporting - Infrared testing detects
loose connections, current overload and defective insulators that cause
safety hazards and outages. |
|
- Energized tests
- equipment remains in operation
- Predictive
Maintenance - replace before failure
- Documentation -
document deficiencies to enable remedial action
|
|
Harmonics Testing and Reporting - Computers, copiers,
electronic lighting ballasts, UPSs, elevators and variable speed drives
create harmonics. |
|
- Test and report level
contamination - reduce life safety hazards and downtime risks
- Watt-hour meter
errors - minimize electric meter errors and reduce your electrical
cost
- Computer memory loss
- memory loss is a costly business disruption
- Energy waste -
preventing the overheating caused by harmonics will reduce energy bills
|
|
Power Factor Testing and Reporting - Power factor should be
measured and addressed to avoid unnecessary expense. We have the solution
for you. |
|
- Existing power factor
correction - confirm proper operation of capacitors
- Test and report
- recommend cost savings actions
- Expand capacity
- add capacity without changing your electrical service
|
|
Typically Maintained Electrical
Components
- auto transfer
switch (ATS)
- branch circuit
breaker panel
- bus duct
- cable testing
- capacitor/power
factor correction
- disconnect/safety
switch
- distribution panel
- emergency generator
- emergency
lighting/exit sign
- high voltage
testing
- indoor/outdoor
lighting
|
- motor control
center
- motor starter
- motor AC/DC
- power conditioner
- power distribution
unit
- production
machinery
- switchgear
- transformer
- uninterruptible
power supply (UPS)
- variable speed
drive
- wire trough/cable
tray
|
|